1.0 INTRODUCTION
  1.1   Purpose of the Report
  1.2   Master Planning Process
2.0 INSTITUTIONAL PROFILE AND SPACE NEEDS ANALYSIS
  2.1    Campus Mission
  2.2    Strategic Plan
  2.3    History of the Institution
  2.4    Campus Enrollment
  2.5    Campus Faculty and Staff
  2.6    Summary of Space Needs
          2.6.1 Summary of University-Wide Space Needs Findings
          2.6.2 Summary of Space Needs for Individual Schools
3.0 BUILDING AND GROUNDS ANALYSIS
  3.1    Campus Setting
          3.1.1 Campus Property
          3.1.2 Adjacent Neighborhoods
          3.1.3 Adjacent Institutions
          3.1.4 Physical Development of Campus
  3.2   Campus Character
          3.2.1 Historic Resources
          3.2.2 Views
  3.3    Building Analysis
          3.3.1 Building Use
          3.3.2 Building Height
          3.3.3 Building Access and Fire Protection
          3.3.4 Facilities Renewal
  3.4   Grounds Analysis
          3.4.1 Streetscape
          3.4.2 Landscape / Open Space
  3.5   Circulation Analysis
          3.5.1 Vehicular Circulation
          3.5.2 Parking
          3.5.3 Pedestrian Circulation
  3.6    Utilities Infrastructure/Energy System Assessment
4.0 MASTER PLAN
  4.1 Planning Principles
  4.2 Concept Plan
  4.3 Proposed Campus Plan
  4.4 Facilities Programs and Development
  4.5 Facilities Renewal
  4.6 Campus Landscape
          4.6.1 Open Space Considerations
          4.6.2 Streetscape Considerations
          4.6.3 Pedestrian Circulation
  4.7 Two-Way Traffic System
  4.8 Utility Infrastructure / Energy Systems
  4.9 Property Acquisition Plan
5.0 DESIGN GUIDELINES
  5.1 Purpose of the Guidelines
  5.2 Architectural Guidelines
  5.3 Landscape Guidelines
6.0 IMPLEMENTATION
  6.1  Phasing Plan
  6.2  Property Acquisition
  6.3  Cost Estimation
  6.4  Conclusion
  6.5  Acknowledgements